TOPOGRAPHIC SURVEY FOR VAM CONG BRIDGE

TOPOGRAPHIC SURVEY FOR VAM CONG BRIDGE

BACH KHOA GEO has carried out topographic survey for onshore and offshore part of the project area from KM0+000 to KM29+201.66 with start point at Cao Lanh district, Dong Thap province and end point  at Thot Not district, Can Tho province.

In package A-3: The Vam Cong bridge project is located in Lap Vo district, Dong Thap province and Thot Not district, Can Tho province. The topographic & hydrographic survey task consists of following items:

  • Topographic survey for routes.
  • Topographic survey for bridges.

top